Diary of a Frontline|Immersive Experience A Day in the Life of an LDAR Tester

7:30

As the morning sunlight filtered through the windows of the company's

LDAR testers arrive at work early.

Change into neat work clothes.

Starting their busy and fulfilling day!

8:00

Before starting the day.

The tester will pick up the instruments that have been warmed up

Perform equipment commissioning calibration;

Connecting the instrument via the testing app.

Prepare for flow calibration and zero and standard gas calibration;

and completing a calibration record.

to ensure proper operation of the equipment for the day.

8:30

Arriving at the project site.

As the inspector prepares to perform the LDAR inspection, the

Scan the factory equipment first using the Inspection APP ;

Uploading tester site location information.

and records of environmental values at the site.

Also get the list of detection points for the detection task.

10:30

The inspectors are starting to get into a tight and organized inspection.

Thousands of detection points in one device.

All of which require rigorous and careful LDAR inspector

Testing in accordance with relevant standards, codes or requirements.

Go to the point details page and start testing that

and record the maximum value and complete the data upload to the platform.

12:00

After a busy morning.

needing to replenish their strength to restore their spirits.

The testers had a simple meal in the cafeteria.

Keeping in good working order.

Take on the challenge of the afternoon!

14:00

After a short lunch break.

They began their afternoon testing mission.

Continuing to locate, videotape, and upload environmental values as required by testing specifications.

Go to the point details page, start the test, upload the test data, the

At the same time, the background visualization display inspection data.

16:30

As the day's testing drew to a close, the

Positive communication with the factory,

Reporting of test results, progress of testing, and

Ensure quality performance.

17:00

Drift test standard gas at the end of the assay.

Record drift logs;

and organizing and analyzing the test data.

Checks the operational status of instruments and equipment and warehouses them.

17:15

The inspectors go through all the inspection data, the

Ensure the accuracy of test data;

Communicate with the project manager if unusual data is found.

Sorting for the day's detection problems.

17:30

Toward the end of the day, the

The team conducts training exchanges on detection techniques.

Summarizing and sharing new insights and experiences from their work.

Working together to improve our work.

18:00

Early evening.

On my way home from work.

Or have a ball game with a coworker;

becoming the best way for inspectors to relieve their fatigue.

Feeling the simple beauty of life!!!